Skip to content

FYFD

  • Blog
  • About
  • Contact Us
  • Email Newsletter

Fixing Mosul Dam

Written by

Nicole Sharp

in

Mosul Dam in Iraq was built with a critical flaw: a foundation of very water-soluble gypsum.
Although the original design made efforts to stabilize the gypsum foundation, it was constantly eroding.
Getting the dam stabilized to the point where Iraqi engineers could maintain it was a huge multi-year international effort in the midst of armed conflict.
←Squeeze-Film Ultrasonic Levitation
Vanishing Spirits – Cognac Edition→

More posts

  • Salt and Dunes

    August 7, 2026
  • How Corals Stir

    August 6, 2026
  • The Subtleties of Pipe Flow

    August 5, 2026
  • Screening for Sleep Apnea

    August 4, 2026
FYFD

FYFD

Celebrating the physics of all that flows

  • Blog
  • About
  • Contact Us
  • Email Newsletter

Twenty Twenty-Five

Designed with WordPress